Listed here in Ascending Date Order by Date Posted to FERC eLibrary.
NOTE: The Docket List on the FERC website is in Date Order by Date Filed, rather than by Date Posted.
Color Key: | Project Developer, Contractors & Supporters Project Opponents Project Neutral Unknown, non-public comments |
October | 2 | 3 | 4 | 5 | 6 | 10 | 13 | 16 | 17 | 18 | 19 | 20 | 24 | 25 | 26 | 27 | 31 |
Filed By: SAVE PASSAMAQUODDY BAY
Filed Date: 10/2/2006
Accession No: 20061001-5002
Description: Report on Potential Economic and Fiscal Impacts of LNG Terminals on the Whole Passamaquoddy Bay (The Whole Bay Study), comment of Save Passamaquoddy Bay on Filing under PF06-13. WEBMASTER'S COMMENTS: This is the study that substantiates the overall negative economic impact that LNG would bring to the Passamaquoddy Bay area.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 9/29/2006
Accession No: 20061003-0175
Description: Downeast LNG, Inc submits its revised draft Resource Report 10 (Alternatives) under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 9/29/2006
Accession No: 20061003-0176
Description: Downeast LNG, Inc submits its revised draft Resource Report 10 (Alternatives) under PF06-13.
Information: FILE LIST [Non-Public]
Filed By: INDIVIDUAL [Sherly L. King]
Filed Date: 9/27/2006
Accession No: 20061004-0084
Description: Comments of Sherly L King in support of the route option #4 concerning the proposed LNG project under PF06-13. WEBMASTER'S COMMENTS: Individual indicates that option #4 avoids more residents.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/3/2006
Accession No: 20061004-0174
Description: Downeast LNG, Inc submits its revised draft of Resource Report 7 (Soils) under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [Pesha, Ronna Marie]
Filed Date: 10/4/2006
Accession No: 20061005-0088
Description: Comments of Ronna Marie Pesha expressing concerns regarding the environmetnal impact of the project under PF06-13. WEBMASTER'S COMMENTS: Ronna Marie Pesha opposes the entire LNG project.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/5/2006
Accession No: 20061006-0166
Description: Downeast LNG, Inc submits revised draft Resource Report 6 pursuant to FERC's request under PF06-13. WEBMASTER'S COMMENTS: 362 pages of text.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/5/2006
Accession No: 20061006-0167
Description: Downeast LNG, Inc submits revised draft Resource Report 6 pursuant to FERC's request under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Drawings of Storage & Regas, Pier, Jetty, and Pipline.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/5/2006
Accession No: 20061006-0168
Description: Downeast LNG, Inc submits revised draft Resource Report 6 pursuant to FERC's request under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Map of FEMA flood zones.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/5/2006
Accession No: 20061006-0169
Description: Downeast LNG, Inc submits revised draft Resource Report 6 pursuant to FERC's request under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: RR 6 2006Oct6 Map of Bedrock, Surficial Geology, Exposed Bedrock, Landslide Suseptibility.
Information: FILE LIST
Filed By: INDIVIDUAL [Berry]
Filed Date: 10/10/2006
Accession No: 20061007-5002
Description: Comments of Individual under PF06-13. WEBMASTER'S COMMENTS: Submitter mentions FERC's statement about Canada that trumps this project.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [Kokoszka]
Filed Date: 10/12/2006
Accession No: 20061013-0049
Description: Comments of Ed Kokoszka regarding the Downeast LNG and Option 4 Pipeline Project under PF06-13. WEBMASTER'S COMMENTS: Submitter objects to project and pipeline.
Information: FILE LIST
Filed By: ENERGY PROJECTS, OFFICE OF [Dunn, Shannon]
Filed Date: 10/13/2006
Accession No: 20061013-3020
Description: Letter to Downeast LNG, Inc enclosing FERC's comments on the draft Environmental Resource Reports 3, 5, 11, and 13 provided for the Downeast LNG Project, and request that Downeast filed a revised draft ERR 3, 5, & 11 etc, PF06-13. WEBMASTER'S COMMENTS: FERC again indicates that not enough information has been supplied by Downeast LNG.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/11/2006
Accession No: 20061013-0137
Description: Downeast LNG, Inc. in accordance with FERC's regulations and its National Environmental Policy Act pre-filing review procedures submits Draft Resource Report 8 Land Use, Recreation and Aesthetics under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0001
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0002
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0003
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0004
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 on Cultural Resources re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0005
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 on Cultural Resources re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0006
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0007
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0008
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/2/2006
Accession No: 20061016-0009
Description: Downeast LNG, Inc submits the revised draft of Resource Report 4 re its application for an LNG import terminal and pipeline facilities under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/12/2006
Accession No: 20061017-0042
Description: Downeast LNG, Inc submits revised Draft Resource Report 2- Water Use and Quality information under PF06-13. Volume 1.
Information: FILE LIST
Filed By: INDIVIDUAL
Filed Date: 10/17/2006
Accession No: 20061017-5064
Description: Comments of Individual concerning the proposed LNG Project in Robbinston, Maine under PF06-13.WEBMASTER'S COMMENTS: Anonymous comment opposing the LNG project.
Information: FILE LIST
Filed By: STATE OF MAINE
Filed Date: 10/12/2006
Accession No: 20061018-0231
Description: State of Maine Department of Conservation submits review of rare and exemplary botanical features,regarding (sic) the proposed Down East LNG Pipline (sic), Option 4 Route et al under PF06-13.
Information: FILE LIST
Filed By: CONSERVATION LAW FOUNDATION
Filed Date: 10/18/2006
Accession No: 20061018-5014
Description: Comments of Conservation Law Foundation on Downeast LNG's Supplemental NOI To Prepare an EIS dated 9-18-06 under PF06-13.
Information: FILE LIST
Filed By: US FISH AND WILDLIFE SERVICE
US FISH AND WILDLIFE SERVICE
US FISH AND WILDLIFE SERVICE
Filed Date: 10/18/2006
Accession No: 20061018-5049
Description: Comments of US Fish and Wildlife Service under PF06-13-000. WEBMASTER'S COMMENTS: USF&WS is critical of the project.
Information: FILE LIST
Filed By: MAINE DEPARTMENT OF CONSERVATION
Filed Date: 10/12/2006
Accession No: 20061019-0105
Description: Maine Dept of Conservation responds to FERC's request for information on the presence of rare or unique botanical features documented from the vicinity of the proposed DELNG pipeline sites in Baring Plantation, etc, PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/18/2006
Accession No: 20061020-0086
Description: Downeast LNG Inc submits revised draft Resource Report 5 (Socioeconomics) under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/19/2006
Accession No: 20061020-0223
Description: Downest LNG Inc submits a revised draft Resource Report 11 (Reliability and Safety) under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/6/2006
Accession No: 20061020-0232
Description: Downeast LNG Inc forwards a revised set of Draft Resource Reports for its Downeast LNG import terminal and pipeline facilities under PF06-13. WEBMASTER'S COMMENTS: Cover letter.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/6/2006
Accession No: 20061020-0233
Description: Downeast LNG Inc forwards Revised Pre-Filing Draft -- Resource Report 1, General Project Description for its Downeast LNG import terminal and pipeline facilities under PF06-13. Volume 1.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/6/2006
Accession No: 20061020-0234
Description: Downeast LNG Inc forwards Revised Pre-Filing Draft -- Resource Report 1, General Project Description for its Downeast LNG import terminal and pipeline facilities under PF06-13. Volume 1. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Map of pipeline route 4.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/6/2006
Accession No: 20061020-0235
Description: Downeast LNG Inc forwards a revised Pre-Filing Draft --Resource Report 1, General Project Description for its Downeast LNG import terminal and pipeline facilities under PF06-13. Volume 2. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/6/2006
Accession No: 20061020-0237
Description: Downeast LNG Inc submits Revised Resourse Report 11 (Reliability and Safety) under PF06-13. WEBMASTER'S COMMENTS: Non-public.
Information: FILE LIST
Filed By: INDIVIDUAL [Bradshaw, Rosemary]
Filed Date: 10/18/2006
Accession No: 20061024-0098
Description: Comments of Rosemary H Bradshaw in opposition to the proposed Downeast LNG Inc's liquefied natural gas terminal plant and sendout pipeline route #4 under PF06-13. WEBMASTER'S COMMENTS: Individual expresses opposition to project.
Information: FILE LIST
Filed By: ENERGY PROJECTS, OFFICE OF
Filed Date: 9/19/2006
Accession No: 20060919-4010
Description: Meeting Minutes for September 19, 2006 meeting with Downeast and agencies to comment on draft Resource Reports under PF06-13. WEBMASTER'S COMMENTS: Rob Wyatt asks if there have been any Freedom of Information Act requests. There is no explanation why this was not posted online by FERC until October 24.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061024-0004
Description: Downeast LNG, Inc submits revised Draft Resource Report 9 (Air and Noise Quality) under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061024-0005
Description: Downeast LNG, Inc submits revised Draft Resource Report 9 (Air and Noise Quality) under PF06-13. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061024-0006
Description: Downeast LNG, Inc submits revised Draft Resource Report 9 (Air and Noise Quality) under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061024-0007
Description: Downeast LNG, Inc. submits revised Draft Resource Report 9 (Air and Noise Quality) under PF06-13. WEBMASTER'S COMMENTS: Critical Energy Infrastructure Information (CEII). Non-public file.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/25/2006
Accession No: 20061025-5017
Description: Downeast LNG, Inc. Submits its 9th Monthly Pre-Filing Status Report for the Period of Sept. 25 through Oct. 24, 2006 under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [Maloney, Gerald]
Filed Date: 10/19/2006
Accession No: 20061025-0084
Description: Comments of Gerald E Maloney expressing concerns regarding the area near his home under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [McPhail, Norman & Elain]
INDIVIDUAL (NO DETAILED AFFILIATION GIVEN)
Filed Date: 10/19/2006
Accession No: 20061025-0085
Description: Comments of Norman and Elain Mcptail (sic) on Options #4 and #5 for the path of the LNG pipeline etc under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [Nicholas, James]
Filed Date: 10/19/2006
Accession No: 20061025-0083
Description: Comments of James Nicholas expressing concerns regarding the LNG Terminal under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [Nicholas, James H]
Filed Date: 10/23/2006
Accession No: 20061025-0005
Description: Comments of James H Nicholas requesting FERC to deny approval of the LNG terminals on the Passamaquoddy Bay and St Croix River under PF06-13.
Information: FILE LIST
Filed By: Filed By: DOWNEAST LNG, INC.
Filed Date: 10/26/2006
Accession No: 20061026-5050
Description: Downeast LNG, Inc. Submits Transmittals of Revised Draft Resource Reprt 4 to Interested Parties under PF06-13. WEBMASTER'S COMMENTS: This file contains only cover letters to area Tribal officials: the Passamaquoddy preservation officer, the Micmac cultural director, the Maliseet environmental planner; and the Maine state historical preservation officer. The Revised Resource Report is not included.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/24/2006
Accession No: 20061026-0064
Description: Downeast LNG, Inc submits corrected labels to its 9/29/06 submittal of revised draft Resource Report 10 (Alternatives) under PF06-13.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/24/2006
Accession No: 20061026-0065
Description: Downeast LNG, Inc submits corrected labels to its 9/29/06 submittal of revised draft Resource Report 10 (Alternatives) under PF06-13. WEBMASTER'S COMMENTS: Non-public file.
Information: FILE LIST
Filed By: INDIVIDUAL [Sullivan, Lea & Joseph]
Filed Date: 10/26/2006
Accession No: 20061026-5027
Description: Comment on Filing of Lea & Joseph Sullivan under PF06-13.
Information: FILE LIST
Filed By: INDIVIDUAL (NO DETAILED AFFILIATION GIVEN) [King, Sheryl L]
Filed Date: 9/27/2006
Accession No: 20061027-0043
Description: Comments of Sheryl L King concerning the "route opinion (sic) 1" which would run along side the St Croix River and its wet land areas under PF06-13. WEBMASTER'S COMMENTS: FERC provides no explanation as to why this document took one month to be posted to the website.
Information: FILE LIST
Filed By: INDIVIDUAL [Berry, Katherine & Richard]
Filed Date: 10/27/2006
Accession No: 20061027-5006
Description: Omission of fact of DELNG monthly pre-filing report #9. WEBMASTER'S COMMENTS: Submitter observes that Downeast LNG failed to include in their report that they lobbied Canadian Federal Government in Ottowa on 2006 September 26, and were soundly rebuked.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0164
Description: Downeast LNG. Inc submits its revised draft resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. WEBMASTER'S COMMENTS: Cover letter, indicating that Downeast LNG has completed its answers to all of FERC's questions regarding the Draft Resource Reports filings.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0165
Description: Downeast LNG submits its Revised Pre-Filing Draft--Resource Report 1 - Fish, Wildlife, and Vegetation under PF06-13. Volume 1, Part 1 of 2. WEBMASTER'S COMMENTS: 188 pages.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0166
Description: Downeast LNG submits its Revised Pre-Filing Draft--Resource Report 1 - Fish, Wildlife, and Vegetation under PF06-13. Volume 1, Part 2 of 2. WEBMASTER'S COMMENTS: 181 pages.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0167
Description: Downeast LNG submits its Revised Pre-Filing Draft--Resource Report 1 - Fish, Wildlife, and Vegetation under PF06-13. Volume 1, Part 1 of 2. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Maps of pier, and Mill Cove marine characterization.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0168
Description: Downeast LNG submits its Revised Pre-Filing Draft--Resource Report 1 - Fish, Wildlife, and Vegetation under PF06-13. Volume 1, Part 1 of 2. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Site plot plan.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0169
Description: Downeast LNG submits its Revised Pre-Filing Draft--Resource Report 1 - Fish, Wildlife, and Vegetation under PF06-13. Volume 1, Part 1 of 2. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: This appears to be an error; it's a duplicate of Accession No. 20061031-0168.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0170
Description: Downeast LNG. Inc submits its Revised Draft Resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. WEBMASTER'S COMMENTS: Twelve pages; Non-internet public.
Information: FILE LISTFiled By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0171
Description: Downeast LNG. Inc submits its Revised Draft Resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0172
Description: Downeast LNG. Inc submits its Revised Draft Resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0173
Description: Downeast LNG. Inc submits its Revised Draft Resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. LARGE FORMAT ONLY. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST
Filed By: DOWNEAST LNG, INC.
Filed Date: 10/20/2006
Accession No: 20061031-0174
Description: Downeast LNG. Inc submits its Revised Draft Resource Report 3 (Fish, Wildlife and Vegetation) under PF06-13. LARGE FORMATS ONLY. WEBMASTER'S COMMENTS: Non-internet public.
Information: FILE LIST